The Complete Catch Basin Installation Process For Efficient Drainage

The Complete Catch Basin Installation Process For Efficient Drainage

The stagnation of moisture on your pavement is one of the leading stressors for property owners. When high soil moisture mixes with other factors, such as precipitation, it turns any area into a swamp, washes out the foundation, and accelerates pavement failure.

Therefore, to avoid waterlogging, flooding, and destruction of the property, you need to have a competent, efficient drainage system.

Here, a catch basin works wonders as it complements the classic foundation of drainage and provides a complete solution to prevent flooding. Moreover, it also allows you to eliminate excess moisture from rain and prevents soil erosion.

But despite the seeming simplicity, a catch basin system requires a complex installation process.

So, if you are wondering how to install the catch basin on your pavement, connect with CAM Services today. Not only can we help you install a new catch basin, but we also provide maintenance and catch basin repair solutions in Jacksonville, FLClick here to get a free quote.

This blog will provide you with a step-by-step process to install a water drainage catch basin and effectively drain excess water off your property.

1. Designing

The most crucial point in planning a catch basin is the exact placement of all its components. This will not only reduce the time spent but also lower the amount of work required. That’s why experts advise paying particular attention to the choice of material for pipes and wells.

2. Digging Trenches

Once you are done with the planning, the next step is to dig a trench for the catch basin. You can either dig the soil by hand or remove the asphalt with special equipment or ordinary scrap. Remember, the trench’s depth depends on the groundwater flow and the diameter of the pipes used. The larger the pipe size, the deeper the bottom of the ditch should be.

3. Preparatory Work 

Next, fill the bottom of the trench with mobile concrete to the tray’s depth so that the shelves of the catch basin trays are even with the surface. Here, don’t forget to give the bottom of the trench a slope of 2 to 3 cm per 1 m. It is essential to direct the slope towards the collector well.

4. Assembling the Catch Basin 

Install the catch basin lines with a string stretched between the pegs. Then, assemble a system of trays with a protective and decorative lattice. Make sure to align the channels according to the designed slope figure until the concrete begins to harden.

5. Installing and Connection of Sand Traps 

The next step is installing sand traps in the places marked during project planning. Ensure they’re connected to the channels laid in the trenches.

6. Formwork and Concrete Pouring 

After connecting all the sand traps, construct a formwork with a board and then pour concrete mortar between it and the tray laid in the trench.

7. Aligning the System during Pouring 

While filling the free space in the formwork with concrete, level the poured material. Also, make sure that the concrete doesn’t alter the position of the slope or the trays. If necessary, make adjustments as required.

8. Curing 

Expect the solution to harden at least 14 to 28 days. During this time, keep the catch basin covered with polyethylene and periodically spray it with water.

9. Testing

Just like any system that requires testing, don’t forget to check your newly installed catch basin. Supply water pressure and look out for any leaks.

10. Paving the Site with Selected Surface 

Finally, dismantle the formwork and level the site with sand and gravel. After this, pave it with paving slabs or the coating you like.

Need a professional to inspect the surface to install the catch basin? We hear you! CAM Services offer premium catch basin installation and maintenance services in Jacksonville, FLClick here to get a quote today!